SMD’s newest innovation in pre‐lay plough technology

LOW-RISK POWER CABLE INSTALLATION AND TRENCHING

The newest addition to SMD's plough range is the multi‐function pre‐lay plough offered in a number of configurations for boulder clearing, trenching and/or backfill. Available with a 150Te and 200Te tow load, this one plough can be set up to carry out any combination of these processes making it economical in both cost and time, minimising lay risk and maximising lay speed.

PRODUCT FEATURES

continuous tow load

Maximum product diameter

multi-depth trench capability

control system

Designed for Maximum Performance

Available with a bollard pull of 150te or 200te with optional jetting capability, the pre-lay plough offers a reduced process time whilst multi-mode ensures minimal mobilisation cost.

Applications
  • Oil and gas
  • Telecoms
  • Renewables
  • Cable maintenance

150te Pre-lay plough KEY FACTS

DIMENSIONS

Length: 15.4m
Width: 9.6m
Height: 7.0m

WEIGHT IN AIR

50te

CABLE DIAMETER RANGE

Up to 250mm

LARS

Available up to Sea State 5


200te Pre-lay plough KEY FACTS

DIMENSIONS

Length: 21.5m
Width: 8.5m
Height: 6.0m

WEIGHT IN AIR

110te

CABLE DIAMETER RANGE

Up to 550mm

LARS

Available up to Sea State 5


Related Products