GLOBAL SUPPORT 24HR HOTLINE: +44 (0) 7801 194301

SMD’s newest innovation in pre‐lay plough technology

LOW-RISK POWER CABLE INSTALLATION AND TRENCHING

The newest addition to SMD's plough range is the multi‐function pre‐lay plough offered in a number of configurations for boulder clearing, trenching and/or backfill. Available with a 150Te and 200Te tow load, this one plough can be set up to carry out any combination of these processes making it economical in both cost and time, minimising lay risk and maximising lay speed.

_Z5A9122

PRODUCT FEATURES

pl-plough-te

continuous tow load

pre-lay-plough-250mm

Maximum product diameter

pre-lay-plough-1-7m

multi-depth trench capability

lightweight cable plough dvecs

control system

Designed for Maximum Performance

Available with a bollard pull of 150te or 200te with optional jetting capability, the pre-lay plough offers a reduced process time whilst multi-mode ensures minimal mobilisation cost.

Applications

  • Oil and gas
  • Telecoms
  • Renewables
  • Cable maintenance

DIMENSIONS

Length: 15.4m
Width: 9.6m
Height: 7.0m

WEIGHT IN AIR

50te

CABLE DIAMETER RANGE

Up to 250mm

LARS

Available up to Sea State 5

DIMENSIONS

Length: 21.5m
Width: 8.5m
Height: 6.0m

WEIGHT IN AIR

110te

CABLE DIAMETER RANGE

Up to 550mm

LARS

Available up to Sea State 5

 

Here to help

Matt for web

Matthew Woodward, Business Development Manager

matthew.woodward@smd.co.uk +44 (0) 7794901896